Typically, the vision is represented in a document. If key stakeholder needs
are captured in a requirements management tool, this part of the document
can be generated by using reporting capabilities. If the vision serves
a set of projects or an entire program, the overall vision might be divided
into several vision work products. In this case, the vision
of the program brings the visions together by providing program-specific content
and referencing the subordinate visions. |