Activity: Integrate and Test
This covers the activities required to fully integrate and test the product. It includes all of the various scopes of testing, including all of the levels and types of tests planned for the iteration, further scoped by the portions of the system appropriate for the test.
Extends: Integrate and Test
DescriptionWork Breakdown StructureTeam AllocationWork Product Usage
Relationships
Parent Activities
Description
This pattern, or set of activities,  encapsulates the complete integration, build, and testing of the system.
Properties
Event Driven
Multiple Occurrences
OngoingYes
Optional
PlannedYes
Repeatable